La Promenade Peninsula

La Promenade Peninsula

Peninsula Promenade

THE CONTEXT

This project was developed by a private developer to offer a maritime promenade open to the public and some sports fields and recreational opportunities for the residents of the residential project that is currently under construction. It is situated on a small peninsula in greater Casablanca, offering 270° views over the ocean.

THE SITE

The site itself is a disused quarry with a grade change of up to 11m between the road and sea level. At this point on the coast, there is no beach, but only a very rocky shore which was totally inaccessible to the public. The maritime engineer confirmed a level of 4.5m as a safe level to be able to install recreational equipment, but the site required protection with rock rip-rap to prevent erosion.

OPPORTUNITIES AND CONSTRAINTS

The grade change was at the same time an opportunity and a constraint. We wanted to keep the park area accessible for people with different abilities while trying to respect the existing configuration of the site so that it seamlessly blended into the surroundings. The harsh sea air also made the choice of a plant palette tricky – the wind and the salt-laden air make for hostile growing conditions. The use of the local stone on the site was first seen as an opportunity, but on exploring the options, the small size of the left-over pieces of stone was not enough to create stable walls or to be used in paving, so we opted for the simple and sinuous forms of concrete and larger rocks for the sake of stability. The project has an uncommon status – built on private land but for public use, at least in part.

LAYOUT

The eastern part of the site is a public park, the western part comprises semi-public recreation facilities reserved for the local residents, and a central area, as yet undeveloped, is reserved with the idea of adding a clubhouse with a swimming pool in the future. The client wished to fence the site to protect it from vandalism and unsocial behaviour. One of the challenges was to provide a fence that was not overly present in the eye of the beholder.

The site is very visible from the street at the upper level, varying from 6m to 11m above sea level, yet the abrupt grade change prevented people from getting close to the waterfront. A very graphic approach was taken using generous curves to create shapes inspired by the sea and to create the desired linkages. An important goal was to allow visitors to get closer to the waterfront and to connect to a wider bicycle and pedestrian path to be constructed along 14km of the coast on both sides of the Promenade Park. The main bleachers sculpt and stabilise the natural curve left when the rock was extracted for building purposes many years previously. The crisp outline in cast concrete is enhanced by the play of shadow around the intermediate steps that are offset alternately from the central radius. These bleachers provide a grandstand from which to watch the sunset over the sea, to watch any type of performance that can be organized on the circular space below, or simply to sit and enjoy the company of another. Universal accessibility is ensured through long sloping paths on either side of the project.

The planting took the form of a paisley tapestry, inspired by the curves of waves, water droplets in the sea spray, and the free-style movement of seabirds in the air to be repeated by users as they "glide" through the space along the serpentine curves. Colours and textures of the plant foliage add to the paisley motif, enriching the space with layers of interest.

Bench-height low walls serve as seating areas and reinforce the graphic layout under the shade of the Tamarisk trees, one of the few species that managed to adapt to the difficult conditions along the coast.

Playful concrete blocks created seating or play elements at the change of grade between the intermediate platform and the lowest one, thus providing grandstand seats for spectators of the basketball games that are to be played on the court.

A mini football field with synthetic grass and a tennis court complete the spaces available for active team sports. Children's play equipment in Robina wood is sturdy and naturally resists the vagaries of coastal conditions. Sporting equipment for health training is also included in the programme.

MATERIALS

The project uses decorative concrete and stabilised sand for most of the paving treatments. The railing along the waterfront looks like a wooden barrier, but it is in fact recycled plastic. The symbolism of this durable use of plastic is not lost as we call to mind the problem of plastics that end up in our oceans. Lighting is solar powered. 

EVALUATION

The project is appreciated by the client and the local community. It has provided recreational opportunities that did not exist before and has become an important node on the wider seafront promenade that is currently being built by the local development company along 14km of coastline. Valuable experience was obtained as far as the plant palette is concerned - several species initially specified were not able to stand the salt-laden air in spite of the bibliographic documentation suggesting otherwise. 

A public-private partnership evolved through the project development which is built on private land but opened, at least partially, for public use. The public promenade continues seamlessly all the way along this section of coast. 

Finding a pre-defined category for this space is difficult because it is privately funded, but part public park, and part private facility for local residents. 

Restoration of this abandoned stone quarry helped restore access to the water and secured the site by providing a convivial space for people to meet, to train, to talk, to play...  instead of the deserted, inaccessible place that was left when stone extraction stopped. 

Univering collaborated as the project engineer.

A project description can be found here: https://youtu.be/WaEpVkBs3Ys

33.536297382767, -7.8242611885071

Authors
Collaborators
Mohamed Bsibes
Year of the project conception
2018
Year of completion of the project
2022
COST (€/m²) ($/m²) (€/ha) ($/ha)
80€/m²
Price category
Regeneration
Price subcategory
Espacios abiertos y equipamientos
Surface
2.7ha
Customer type
Empresa privada
Customer Name
Espace Developpement
Construction company
STAM and Atelier Vert
Works management
Mohamed Bsibes, Carey Duncan Design
Maintenance manager
Espace Developpement
Maintenance costs (€/m²)
1,60 €/m² per year
地址
Peninsula, Dar Bouazza
Coordinates UTM
Latitude: 33.53629738276705 Longitude: -7.82426118850708
City / Place
Tamaris
区域
Grand Casablanca
国家
摩洛哥