PROYECTO DE PAYSAJE PARA EL VERTEDERO ASA

PROYECTO DE PAYSAJE PARA EL VERTEDERO ASA

LANDSCAPE PROJECT FOR THE ASA LANDFILL

 

The ASA landfill is for non-hazardous waste derived from industrial activities, and consists of two separate landfill sites located in depleted clay pits: the first (Sectors 1 and 2), having reached full capacity, is now in the post-operational phase; the second (Sector 3) is currently operational.

In 2010, we developed an overall Landscape Project as integral part of a proposal concerning an increase in disposal volume of Sector 3. The signs of the historical agricultural landscape, still visible as the structure of the ancient Roman settlement (centuriatio), become a reference for designing the geometric shape of the active landfill, conceived as a landmark, and the insertion of vegetation lines which generate ecological corridors for wildlife and pathways for man. In particular, in Sectors 1 and 2, the centuriatio suggested the spatial composition of pedestrian paths, ditches for draining rains, poplar rows, hedgerows of native berry shrubs, and grasses subject to different mowing regime, including wild flowering meadows. Moreover, soft forms draw shrubby patches that were shaped re-profiling areas of a previous environmental restoration, through extirpations, transplantations on site and new planting. Screening hedgerows were removed in order to open the view. Therefore, the intervention acquires both a strong land art physiognomy and the vibrancy of biological diversity.

The works in Sectors 1 and 2 were completed in 2017. Currently, waste disposal in Sector 3 takes place by constructing the landform envisaged by the Landscape Project.

 

Pictures © P'ARC

44.58261, 11.39138

Collaborators
Matteo Zamagni
Sara Angelini
Paolo Rosetti – agronomic consulting
Year of the project conception
2010
Year of completion of the project
2017 (Landfill Sectors 1 and 2)
COST (€/m²) ($/m²) (€/ha) ($/ha)
Sectors 1 and 2: ca. 6 €/m²
Price category
Regeneration
Price subcategory
Infraestructuras
Surface
Sectors 1 and 2: ca. 100.000 mq
Customer type
Empresa privada
Customer Name
ASA - Azienda Servizi Ambientali Scpa
Construction company
Sectors 1 and 2: Unirecuperi Srl; Cofar Srl; A.&N. Costruzioni Srl
Works management
Sectors 1 and 2: Works Supervisor Enrica Dall'Ara; Assistant Paolo Rosetti
Maintenance manager
ASA - Azienda Servizi Ambientali Scpa
Maintenance costs (€/m²)
Sectors 1 and 2: 0,065 €/m²
Address
Via Saliceto 43
Coordinates UTM
44.583576, 11.391847
City / Place
Castel Maggiore
Region
Bologna Metropolitan Area, Emilia–Romagna Region
Country
Italy